Site Information

Asentamiento

Help with the school there includes:
- Construction of a metal-welded water tower with tank, installation of a water
pump, connecting the system to a nearby well, and water tubes to the school.
- Electrifying of the school and bringing lights to the classrooms.
- 50 requested MINED curriculum books.
- Book costs 9,977 cordobas ($453), construction costs 25,488 cordobas ($1157)
- Total Cost 35,465 cordobas ($1,610).

Asentamiento



Astillero

Help with the school there includes:
- The repainting of its entire 7 classroom school, with oil paint.
- The reconnection to electricity and installation of new switches, outlets, lights.
- 2 new doors, new locks and hinges for all the doors, and a new large padlock.
- 4 new whiteboards, markers and shelves.
- 1 used laptop and 1 new HP printer.
- 150 requested MINED curriculum books.
- Book costs 25,846 cordobas ($1,173), construction costs 34,395 cordobas ($1,562)
- Total Cost 60,241 cordobas ($2,735).

Barrio Nuevo

Help with the school there includes:
- The reconstruction of a degraded well and attachment of hand pump.
- Dry erase markers
- 42 requested MINED curriculum books.
- Books cost 6,811 cordobas ($309) and construction cost 1,776 cordobas ($81).
- Total costs 8,587 cordobas ($390).

Berlin

Help with the school there includes:
- An entirely new school construction in the remote village of Berlin, made
from brick, steel, and metal roof.
Dimensions are 10x10 meters.
Materials were transported by ox cart, an additional cost.
- The school is nearly finished, and still needs to be painted, to have doors
installed, windows, latrine, and solar panel attached.
- 46 requested MINED curriculum books.
- Books cost 7,323 cordobas ($333) and construction cost 121,489 cordobas ($5,516)
- Total costs 128,812 cordobas ($5,849).

Berlin


El Higueral

Help with the school there includes:
- Help with security by getting new door handles, padlocks, and window panes.
- Reconnection to electricity.
- New latrine doors
- Electrical outlets and lights
- New barbwire fence
- Repainting of a classroom.
- 45 requested MINED curriculum books.
- Book costs 6,462 cordobas ($293) and construction cost 8,585 ($390)
- Total cost 15,047 cordobas ($683).

Higueral



El Higueral CICO

Help with the school there WILL include:
- A rebuild of an old farm building into a daycare/preschool.
- Repair of the floor and new tile will be installed.
- New paint.
- Paint and repair of the roof.
- Total cost 13,398 cordobas ($608).

Las Cañas Abajo

Help with the school there inludes:
- Repainting of the entire 3 classroom school.
- Installation of a new barbwire fence and cemented posts.
- Attachment to electricity and installation of 3 switches, 3 outlets, and 9 lights.
- 2 new doors, 4 new door locks, 10 hinges and 1 large padlock.
- 1 new whiteboard and 4 markers
- 67 requested MINED curriculum books.
- Book costs 9,974 cordobas ($453) construction cost 16,458 cordobas ($747).
- Total costs 26,432 cordobas ($1,200).

Las Canas



Las Salinas Escuela

Help with the school there includes:
- Help with a computer lab; 8 desks, 10 backup batteries.
- 5 new doors, hinges, locks, frames and new siding for latrines, and paint.
- New HP printer and printer cable.
- 265 requested MINED curriculum books.
- Book costs 32,600 cordobas ($1480), construction cost 34,427 cordobas ($).
- Total costs 67,027 cordobas ($3,043).

Las Salinas



Las Salinas CICO

Help with the school there includes:
- Stringing of new barbwire fence and cementing of posts.
- Painting of the inside and outside of the 1 classroom building.
- New welded metal bars for 4 windows. 2 door handles
- Connection to electricity and installation of lights, switches, and outlets.
- 1 whiteboard.
- Total costs 11,933 cordobas ($542)

Las Salinas CICO



Limon #1

Help with the school there includes:
- New door handles and hinges for 6 doors.
- New latrines, with brick lined holes, and outhouses, painted.
- Repainting of swingsets.
- New electric pump with new tubing and connections.
- 51 requested MINED curriculum textbooks.
- Book costs 8,271 cordobas ($376) and construction costs 16,434 cordobas ($746).
- Total costs 24,705 cordobas ($1,122).

Limon #1



Limon #2

Help with the school there includes:
- A new metal-welded water tower, with tank, electric pump, and water tube
system to the school.
- Electrical connection to the school and water pump.
- 92 requested MINED curriculum textbooks.
- Book costs 14,595 cordobas ($663) and construction costs 20,718 cordobas ($941).
- Total costs 35,313 cordobas ($1,603).

Limon #2


Limon #2 CICO

Help with the school there includes:
- The digging and brick lining of a new well.
- The installation of a new electrical pump.
- Total costs 14,248 cordobas ($647).

San Ignacio

Help with the school there includes:
- The construction of a small wall and installation of a chain link fence around
the property.
- 2 new computer desks
- 9 padlocks
- 209 requested MINED curriculum textbooks.
- Book costs 37,677 cordobas ($1,711) and construction costs 30,523 cordobas ($1,386).
- Total costs 68,200 cordobas ($3,097).

San Luis

Help with the school there includes:
- This is a new school construction site, with measurements of 18x9meters.
- Nearly all the construction materials have been purchased and the school is
currently under construction.
- This will be a 2 classroom school.
- 48 requested MINED curriculum textbooks.
- Book costs 8,020 cordobas ($364) and construction costs so far 105,428 cordobas ($4,787).
- Total costs so far 113,448 cordobas ($5,151).

3 Ernestos Biblioteca

Help with the library includes:
- The construction of shelves and desks.
- 35 requested MINED curriculum textbooks.
- Book costs 6,124 cordobas ($278) and construction costs 4,209 cordobas ($191).
- Total costs 10,333 cordobas ($469).

Virgen Morena

Help with the school there includes:
- 1 laptop, 1 HP printer, cable, and extra cartridge.
- New metal fence tubes, rebar inserts, and chain link fencing.
- 8 new door locks and 23 glass window inserts.
- New wire shelves.
- 148 requested MINED curriculum textbooks.
- Book costs 19,554 cordobas ($888) and construction costs of 21,250 cordobas ($965).
- Total costs 40,804 cordobas ($1,853).