(Preschool and Primary School)
Help for the school included: - A new school construction, with measurements of 18x9meters. - 2 classroom school serving both preschool and primary school students. - 48 requested MINED curriculum textbooks. - Book costs 8,020 cordobas ($364).
- The installation of a water tower and latrine. - Grid system electricity brought to the area by PRE and a local rancher. 76,500 cordobas ($3500).
- Total cost: 370,646 cordobas ( $15,444). |