Projects‎ > ‎

SAN LUIS

(Preschool and Primary School)

Help for the school included:
- A new school construction, with measurements of 18x9meters.
- 2 classroom school serving both preschool and primary school students.
- 48 requested MINED curriculum textbooks.
- Book costs 8,020 cordobas ($364).
- The installation of a water tower and latrine. 
- Grid system electricity brought to the area by PRE and a local rancher. 76,500 cordobas ($3500).
- Total cost: 370,646 cordobas ($15,444).