(Preschool and Primary School)
Help for the school included: - A new metal-welded water tower, with tank, electric pump, and water piping system with spigots. - Electrical connection to the school and water pump. - 92 requested MINED curriculum textbooks.
- The construction of large roof for the school's outdoor pavilion.
- Book costs 14,595 cordobas ($663).
- Total cost: 36,296 cordobas ($1,649).
|