Projects‎ > ‎

LIMON #2

(Preschool and Primary School)

Help for the school included:
- A new metal-welded water tower, with tank, electric pump, and water piping system with spigots.
- Electrical connection to the school and water pump.
- 92 requested MINED curriculum textbooks.
- The construction of large roof for the school's outdoor pavilion. 
- Book costs 14,595 cordobas ($663).
- Total cost: 36,296 cordobas ($1,649).