Projects‎ > ‎

EL LAJAL

(Preschool and Primary School)

Help for the school included:
- Facilitating the digging of a well and the materials for well construction.
- Writing chalk and sporting equipment.
- Barb wire for fence repairs.
- Cable for an electrical connection to the school.
- Total cost: 7,246 cordobas ($308).