(Preschool)Help for the school included: - A rebuild of an old storage structure into a daycare/preschool. - Repair of the floor, and outer corridor with concrete and new tile. - New paint. - Repair of the doors and walls. - Repair of the kitchen.
- Paint and repair of the roof. - Total cost: 13,462 cordobas ( $608). |