(Preschool and Primary School)
Help for the school included: - The reconstruction of a degraded well and attachment of hand pump. - Dry erase markers - 42 requested MINED curriculum books. - Books cost 6,811 cordobas ($309) and construction cost 1,776 cordobas ($81).
- A handicap access ramp to the front of the school.
- A power-line connection to electrify the school.
- Total cost: 10,587 cordobas ($470). |