Projects‎ > ‎

BARRIO NUEVO

(Preschool and Primary School)

Help for the school included:
- The reconstruction of a degraded well and attachment of hand pump.
- Dry erase markers
- 42 requested MINED curriculum books.
- Books cost 6,811 cordobas ($309) and construction cost 1,776 cordobas ($81).
- A handicap access ramp to the front of the school.
- A power-line connection to electrify the school.
- Total cost: 10,587 cordobas ($470).