(Primary School)
Help for the school included: - The construction of a metal water tower with tank, installation of a water pump, connecting the system to a nearby well, and water tubes to the school with spigots.
- Electrifying of the school and bringing lights to the classrooms. - 50 requested MINED curriculum books.
- The donation of school supplies
- Book costs 9,977 cordobas ($453)
- Total Cost: 36,465 cordobas ($1,680).
|